
2009–2023The Judicial InquiryA 2018–2020 public inquiry into the 2012 sale of half of Collus Power and the arena and pool built with the money. It made 306 recommendations.
2011–2019Collus Power saleThe Town-owned electric utility. Half was sold to PowerStream in 2012, and the utility was sold to EPCOR in 2018.
1948–2026Arena, pool & rec centreFrom the 1948 arena to the 2012 fabric buildings and today's plan for a new recreation centre at 725 Tenth Line.
2014–2026New hospitalThe long plan for a new Collingwood General and Marine Hospital, now at Stage 2.1 with a site on Poplar Sideroad.
1883–2025The Terminals & waterfrontThe 1929 grain terminals, 103 years of shipbuilding, and the Terminals Point redevelopment.
2021–2026Water & sewer capacityWhy new building paused from 2021 to 2023, and the water treatment plant expansion that followed.
2010–2026How Council changedMayors, CAOs, elections and strong mayor powers since 2010.
2014–2024Other local controversiesThe Admiral Collingwood conflict report, the Sunset Point survey, Hume Street and more.