The Ontario Building Code requires at least two business days' notice for an inspection.
Mandatory inspection stages are listed on it.
Give the permit number, address, inspection type, date, AM or PM, and the builder's contact.
Work must be ready. A failed inspection needs a re-inspection.
Closes the permit.